From a multi-level bill of materials to a finished work order, Totaum plans the material, tracks the labor, and posts the cost to the ledger as you go — no separate MRP tool bolted onto separate books.
Production, MRP, and shop-floor features sit in the Manufacturing tier.
MRP — material requirements planning — turns demand, stock, and lead times into what to buy and build, and when. Totaum includes MRP in the Manufacturing tier, driven directly by BOMs, work orders, and inventory.
No. Operators and service technicians use a free operator interface and never count as a billable seat, regardless of how many are on the floor.
Start free, or talk through your year-one number with us.